Sizes
Pick by the stage of work, not by a number.
Every size below shows cubic yards, cubic metres, and the stage it suits. Between two? Message us — oversizing wastes budget, undersizing costs a swap you didn't plan for.

≈ 5.4 m³
Right for
Snagging and finishing waste, a single-room strip-out, tight sites with no room to manoeuvre.

≈ 7.6 m³
Right for
Fit-out and MEP second-fix waste, a shop refit, a small villa strip-out.

≈ 15.3 m³
Right for
Full villa renovation, mixed C&D waste on a small build, bulky material in volume.

≈ 22.9 m³
Right for
Demolition rubble and concrete, a large villa taken back to shell.

≈ 30.6 m³
Right for
Bulk excavation spoil, sustained site work, commercial clearance at volume.
Between two sizes?
Tell us the job and we'll tell you the size. It takes one message and it's the single easiest way to avoid paying for space you don't use.
Get the Nefaya appQuestions
The things people actually ask.
Send one message. Move a container.
Tell us the site and the stage. We'll size it, place it, and swap it when the crew needs it.